H-095 BUILD / CONSTRUCTION VALIDATION
=====================================

These checks validate software construction only. They are NOT scientific evidence and are not substitutes for the user's fresh FULL R25/R33 run.

Validation profile (R9/R11): PASS all seven stages.
- Firewalls/imported frozen mechanics: PASS.
- Deterministic hidden-phase volume reproduced inherited H-007 support probabilities to <= 1.11e-16 on construction directions.
- Free-flight carried phase stayed within the nearest-shelf half-node bound; reflection/rotation controls were exact to displayed precision; transverse reversal residual ~2.47e-14 node widths.
- Smooth kinematic arc: deterministic rerun identical; reflection/rotation errors zero to displayed precision; carried phase stayed < 0.5 component node width.
- R9/R11 gravity generation completed GR-CLOSED with no phase/capture/steering use of GR labels.
- R9/R11 scoring completed after generation and retained nearest-shelf controls in the validation profile.

Targeted full-resolution smoke (NOT a scientific score):
- R25, one XY / b=2.35 / seed-0 case.
- 400 completed transits.
- PHASE_CARRY nonpreferred hops: 0 in this short phase-zero smoke path.
- max carried phase component: ~3.40e-4 node widths.
- max phase-volume vs H-007 probability difference: < 1e-15.
- chosen shelf == GR-nearest support and H-089-FV-nearest support for all smoke steps.

Packaging checks:
- Python 3.10 AST compatibility: PASS.
- H-095 import/dependency check: PASS.
- R25/R33 active; R39/R45 deferred: PASS.
- No stale H-095 CSV/results/checkpoint/cache/venv included: PASS.
