FrostCandy's Laboratory · standalone browser packet · v1.0.39

Shapiro Time Delay — Frozen Photon Path + Three-Axis FrostClock Coupling

Ask a different question of the already-frozen photon/gravity machinery: after the photon path is generated, does the FrostGrid's mechanically derived three-axis clock response produce the additional travel-time delay without inserting the GR answer?

Status: Provisionally frozen Shapiro timing result. This packet isolates the browser demonstration from the main website. Use the Python/original-research downloads in the parent Lab folder for the historical full audit where applicable.
SEALED H-116 FV TIMING CASEREADY
Schematic outer clock/deformation depth region. Timing contribution is computed by the historical FV pipeline, not from this drawing. Schematic deeper FrostField clock-response region. Spherical source / gravity-well center for this schematic path view. Flat reference path shown only as a visual baseline. It is not the GR Shapiro ruler. Frozen FV photon path used by the timing candidate. The path is already fixed; this Lab tests accumulated travel time through the same deformation field rather than retuning the bending path. Signal marker replaying the selected sealed FV timing case. FROZEN PHOTON PATH · CLOCK-DEPTH TIMING AUDIT Choose an H-116 geometry, then load the sealed FV timing case.
FV TIMING CASE NOT LOADED
FrostClock C3Dmean(|principal log strain|) / max(|principal log strain|)
Reference rayb = 6.80

Browser mode replays sealed H-116 metadata. Use the Python download for the actual FV field/timing rerun.

FV differential delay—
GR differential delayRULER CLOSED
Radial C3D median—
Axis covariance spread—
Raw-control FV / GRRULER CLOSED
C3D FV / GRRULER CLOSED
Timing relative errorRULER CLOSED
Predeclared timing gateRULER CLOSED